Project scope |
Project address |
Build time |
Capacity |
Generation type |
Array configuration |
Customer |
Construction |
155 Dynamic Dr |
2020.10-2020.12 |
Net Metering |
Roof Mounted |
275,000 |
AB Solar Group |
Construction |
1440 Birchmount |
2020.10-2020.12 |
Net Metering |
Roof Mounted |
168,000 |
AB Solar Group |
Construction |
330 Middlefield |
2020.10-2020.12 |
Net Metering |
Roof Mounted |
303,000 |
AB Solar Group |
Construction |
55 Scarsdale Rd |
2020.10-2020.12 |
Net Metering |
Roof Mounted |
151,000 |
AB Solar Group |
Construction |
MH1 |
2020.3-2019.05 |
FIT 5.0 |
Ground Mounted |
600,000 |
Grasshopper Solar Corp. |
Construction |
Madill 2 |
2019.10-2020.02 |
FIT 5.0 |
Ground Mounted |
600,000 |
Grasshopper Solar Corp. |
Construction |
Mennil |
2019.09-2019.10 |
FIT 5.0 |
Ground Mounted |
600,000 |
Grasshopper Solar Corp. |
Construction |
Arbour |
2019.09-2019.10 |
FIT 5.0 |
Ground Mounted |
600,000 |
Grasshopper Solar Corp. |
Construction |
Stonehouse |
2019.08-2019.10 |
FIT 5.0 |
Ground Mounted |
600,000 |
Grasshopper Solar Corp. |
Construction |
CE5 |
2019.07-2019.09 |
FIT 5.0 |
Ground Mounted |
600,000 |
Grasshopper Solar Corp. |
Construction |
CE2 |
2019.07-2019.09 |
FIT 5.0 |
Ground Mounted |
600,000 |
Grasshopper Solar Corp. |
Full EPC Service |
1605 McEwen Dr, Whitby |
2019.03-2019.12 |
Net Metering |
Roof Mounted |
93,000 |
Atlantic Coated Papers |
Construction |
620 King St. W |
2019.02-2019.02 |
Net Metering |
Roof Mounted |
27,720 |
Panasonic |
Construction |
Algonquin College |
2019.01-2019.07 |
Net Metering |
Roof Mounted |
532,800 |
PCL |
Full EPC Service |
941 Progress Ave, Scarborough, ON |
2018.08-2018.12 |
Carport/Smart Grid |
Ground Mounted |
48 |
Centennial College |
Construction |
43 Whitedeer Rd. Hamilton |
2018.08-2018.09 |
FIT 4.0 |
Roof Mounted |
261,300 |
Panasonic |
Construction |
600 Acadia Dr. Hamilton |
2018.07-2018.08 |
FIT 4.0 |
Roof Mounted |
239,800 |
Panasonic |
Construction |
50 Vrandenburg Dr.Scarborgouh |
2018.06-2018.07 |
FIT 4.0 |
Roof Mounted |
60,800 |
Toronto District School Board/Potentia Renewables Inc |
Construction |
20 Manse road, Toronto |
2018.05-2018.06 |
FIT 4.0 |
Roof Mounted |
85,300 |
Toronto District School Board/Potentia Renewables Inc |
Construction |
70 Brookhaven Drive, Toronto, On |
2018.05-2018.06 |
FIT 4.0 |
Roof Mounted |
86,400 |
Toronto District School Board/Potentia Renewables Inc |
Construction |
380 GoldHawk, Scarborgouh |
2018.04-2018.05 |
FIT 4.0 |
Roof Mounted |
77,600 |
Toronto District School Board/Potentia Renewables Inc |
Construction |
635 Tecumseh Rd. West, Windsor |
2018.02-2018.05 |
FIT 4.0 |
Roof Mounted |
576,000 |
Solar Power Network |
Construction |
111 Moatfield Dr., Toronto |
2018.01-2018.08 |
Net Metering |
Roof Mounted |
78,400 |
Black & McDonald |
Full EPC Service |
Bermondsey Yard |
2018.02-2018.03 |
FIT 4.0 |
Roof Mounted |
178,440 |
City of Toronto/Toronto Hydro |
Full EPC Service |
715 Milner Avenue |
2018.01-2018.09 |
FIT 4.0 |
Roof Mounted |
599,760 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Jane Sheppard Public Library- 1906 Sheppard Ave W |
2017.06-2017.08 |
FIT 4.0 |
Roof Mounted |
9,920 |
City of Toronto/Toronto Hydro |
Full EPC Service |
York Community Centre – 115 Black Creek Dr |
2017.06-2017.08 |
FIT 4.0 |
Roof Mounted |
10,000 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Ancaster Child Care Centre – 45 Ancaster Road |
2017.06-2017.08 |
FIT 4.0 |
Roof Mounted |
10,000 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Parliament Public Library – 269 Gerrard Street E |
2017.06-2017.08 |
FIT 4.0 |
Roof Mounted |
10,000 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Mount Dennis Public Library – 1123 Weston Road |
2017.06-2017.08 |
FIT 4.0 |
Roof Mounted |
10,000 |
City of Toronto/Toronto Hydro |
Full EPC Service |
715 Milner Avenue |
2017.08-2017.10 |
FIT 4.0 |
Roof Mounted |
500,000 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Commander Park Arena – 140 Commander Boulevard |
2017.08-2017.10 |
FIT 4.0 |
Roof Mounted |
240,000 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Scarborough Village RC Arena – 3600 Kingston Road |
2017.09-2017.10 |
FIT 4.0 |
Roof Mounted |
130,000 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Ted Reeve – 175 Main Street |
2017.09-2017.10 |
FIT 4.0 |
Roof Mounted |
130,000 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Bendale Public Library – 1515 Danforth Road |
2017.06-2017.08 |
FIT 4.0 |
Roof Mounted |
9,920 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Brentwood Public Library – 36 Brentwood Road N |
2017.03-2017.05 |
FIT 4.0 |
Roof Mounted |
9,920 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Danforth/Coxwell Library – 675 Danforth Ave |
2017.03-2017.05 |
FIT 4.0 |
Roof Mounted |
9,920 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Palmerston Public Library – 560 Palmerston Ave |
2017.03-2017.05 |
FIT 4.0 |
Roof Mounted |
9,920 |
City of Toronto/Toronto Hydro |
Full EPC Service |
S. Walter Stewart Public Library – 170 Memorial Park Ave |
2017.03-2017.05 |
FIT 4.0 |
Roof Mounted |
9,920 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Albion Community Centre & Pool & Fit Centre |
2017.03-2017.05 |
FIT 4.0 |
Roof Mounted |
59,879 |
City of Toronto/Toronto Hydro |
Full EPC Service |
71 Rexdale Solar PV |
2017.09-2017.11 |
FIT 4.0 |
Roof Mounted |
600,000 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Albion Arena |
2017.09-2017.11 |
FIT 4.0 |
Roof Mounted |
168,000 |
City of Toronto/Toronto Hydro |
Full EPC Service |
Albion Library |
2017.09-2017.11 |
FIT 4.0 |
Roof Mounted |
48,000 |
City of Toronto/Toronto Hydro |
Construction |
24 Oak, Leamington |
2017.03-2017.05 |
FIT 3.1 |
Roof Mounted |
191,360 |
Grasshopper |
Construction |
55 Talbot, Leamington |
2017.03-2017.05 |
FIT 3.1 |
Roof Mounted |
375,480 |
Grasshopper |
Construction |
129 Erie, Leamington |
2017.03-2017.05 |
FIT 3.1 |
Roof Mounted |
84,160 |
Grasshopper |
Construction |
Messenger PP-1548 |
2017.03-2017.05 |
FIT 3.1 |
Roof Mounted |
600,000 |
KBRE Ltd. |
Full EPC Service |
155 Shields Ct, Markham, Ontario |
2017.11-2017.12 |
FIT 4.0 |
Roof Mounted |
86,000 |
LH Solar Inc. |
Full EPC Service |
3650 Eagle Street, Stevensville, Ontario |
2017.11-2017.12 |
FIT 4.0 |
Roof Mounted |
108,000 |
LH Solar Inc. |
Full EPC Service |
2196 Gerber Rd, Baden, Ontario |
2017.11-2017.12 |
FIT 4.0 |
Roof Mounted |
72,000 |
LH Solar Inc. |
Full EPC Service |
3543 Nafziger Rd, Baden, Ontario |
2017.11-2017.12 |
FIT 4.0 |
Roof Mounted |
72,000 |
LH Solar Inc. |
Construction |
24 Clair Road, Guelph, N1L-1M7 |
2017.09-2017.11 |
Net Metering |
Roof Mounted |
234,000 |
Essex Energy Corp |
Construction |
1 Rossland Rd East Ajax, L1Z 1Z2 |
2017.09-2017.11 |
Net Metering |
Roof Mounted |
244,800 |
Essex Energy Corp |
Full EPC Service |
Birchmount Park – 101 Ridgetop Road |
2016.09-2016.12 |
50,000 |
FIT 4.0 |
Roof mounted |
City of Toronto/Toronto Hydro |
Full EPC Service |
Scarborough CG Arena – 1967 Ellesmere Road |
2016.09-2016.12 |
130,000 |
FIT 4.0 |
Roof mounted |
City of Toronto/Toronto Hydro |
Full EPC Service |
Warden Hilltop CC – 25 Mendelssohn Street |
2016.09-2016.12 |
40,000 |
FIT 4.0 |
Roof mounted |
City of Toronto/Toronto Hydro |
Full EPC Service |
Fairfield Seniors Center – 80 Lothian Avenue |
2017.01-2017.03 |
10,000 |
FIT 4.0 |
Roof mounted |
City of Toronto/Toronto Hydro |
Full EPC Service |
Fire hall 145 – 20 BeffortRoad |
2017.01-2017.03 |
8,000 |
FIT 4.0 |
Roof mounted |
City of Toronto/Toronto Hydro |
Full EPC Service |
North York Animal Center – 1300 Sheppard Ave W |
2017.01-2017.03 |
10,000 |
FIT 4.0 |
Roof mounted |
City of Toronto/Toronto Hydro |
Full EPC Service |
Ramsden Yard – 1008 Yonge St |
2017.01-2017.03 |
10,000 |
FIT 4.0 |
Roof mounted |
City of Toronto/Toronto Hydro |
Full EPC Service |
Fire Hall 426 – 140 Lansdowne Ave |
2017.01-2017.03 |
10,000 |
FIT 4.0 |
Roof mounted |
City of Toronto/Toronto Hydro |
Full EPC Service |
Fire Hall 413 – 1549 Albion Rd |
2017.01-2017.03 |
10,000 |
FIT 4.0 |
Roof mounted |
City of Toronto/Toronto Hydro |
Design and Build |
Gooderham Learning Centre |
2016.08-2016.12 |
27,000 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Chester Le Jr PS |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Lambton Park Community School |
2016.08-2016.12 |
42,880 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Niagara Street Junior PS |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Dovercourt Junior PS |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Earl Haig SS |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
George Anderson PS |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Etobicoke YearRound |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Wedgewood JS |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
King George Jr PS |
2016.08-2016.12 |
48,960 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Pineway PS |
2016.08-2016.12 |
74,040 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Faywood Art |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Firgrove PS |
2016.08-2016.12 |
48,960 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Hillmount PS |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Courcelette PS |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Harrison PS |
2016.08-2016.12 |
25,460 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Sprucecourt Jr PS |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Gracefield PS |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Harwood Jr. PS |
2016.08-2016.12 |
24,120 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Dellcrest Public School |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
North Bendale Jr PS 26.80 |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
School of Experiential Ed. |
2016.08-2016.12 |
42,880 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Warren Park Jr PS |
2016.08-2016.12 |
27,470 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Cosburn MS |
2016.08-2016.12 |
51,260 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Montrose Jr PS |
2016.08-2016.12 |
26,800 |
FIT 2.1 |
Roof mounted |
Toronto District School Board/Potentia Renewables Inc. |
Design and Build |
Edenbrook-Hill Public School |
2016.12-2017.03 |
151,200 |
FIT 2.1 |
Roof mounted |
Peel District School Board/Potentia Renewables Inc. |
Design and Build |
Ingleborough-Public School |
2016.12-2017.03 |
246,400 |
FIT 2.1 |
Roof mounted |
Peel District School Board/Potentia Renewables Inc. |
Design and Build |
Fletchers-Meadow Secondary School |
2016.12-2017.03 |
417,200 |
FIT 2.1 |
Roof mounted |
Peel District School Board/Potentia Renewables Inc. |
Design and Build |
Garthwood-Park Public School |
2016.12-2017.03 |
134,400 |
FIT 2.1 |
Roof mounted |
Peel District School Board/Potentia Renewables Inc. |
Design and Build |
Dolphin-Senior Public School |
2016.12-2017.03 |
106,400 |
FIT 2.1 |
Roof mounted |
Peel District School Board/Potentia Renewables Inc. |
Design and Build |
Ray Underhill-Public School |
2016.12-2017.03 |
84,000 |
FIT 2.1 |
Roof mounted |
Peel District School Board/Potentia Renewables Inc. |
Construction |
71 Main Street, Glencoe |
2015.03-2015.12 |
60,000 |
FIT 2.1 |
Roof mounted |
Municipality of Glencoe/Solar Income Fund |
Construction |
138 Mill Street, Glencoe |
2015.03-2015.12 |
179,000 |
FIT 2.1 |
Roof mounted |
Municipality of Glencoe/Solar Income Fund |
Construction |
715 Fanshawe Park Rd. W,London |
2015.03-2015.12 |
96,140 |
FIT 2.1 |
Roof mounted |
City of London/Solar Income Fund |
Construction |
185 Ashland Ave, London |
2015.03-2015.12 |
238,630 |
FIT 2.1 |
Roof mounted |
City of London/Solar Income Fund |
Construction |
7261 Vitoria Park Avenue, Markham |
2015.05-2015.09 |
300,000 |
FIT 2.0 |
Roof mounted |
Ranka Group |
Construction |
220 Torbay Road, Markham |
2015.04-2015.09 |
234,000 |
FIT 2.0 |
Roof mounted |
Ranka Group |
Construction |
927251 OXFORD RD 8 PLATTSVILLE |
2015.08-2015.12 |
250,800 |
FIT 2.0 |
Roof mounted |
Mann Solar Ltd. |
Construction |
224 7th AVE, HANOVER |
2015.09-2015.12 |
296,730 |
FIT 2.0 |
Roof mounted |
Mann Solar Ltd. |
Construction |
1126 Sutton Street, Kincardine |
2015.09-2015.12 |
119,070 |
FIT 2.0 |
Roof mounted |
Mann Solar Ltd. |
Construction |
921 Barton |
2014.05-2014.12 |
260,000 |
FIT 2.0 |
Roof mounted |
Mann Solar Ltd. |
Construction |
840 Division |
2014.05-2014.12 |
429,000 |
FIT 2.0 |
Roof mounted |
Mann Solar Ltd. |
Construction |
5900 Thorold Stone Road |
2014.05-2014.12 |
373,000 |
FIT 2.0 |
Roof mounted |
Mann Solar Ltd. |
Construction |
227 Bunting |
2014.05-2014.12 |
338,000 |
FIT 2.0 |
Roof mounted |
Mann Solar Ltd. |
Construction |
230 Deerhurst |
2014.09-2014.12 |
221,430 |
FIT 2.0 |
Roof mounted |
Sky Solar Ltd. |
Construction |
2000 Clark |
2014.09-2014.12 |
526,740 |
FIT 2.0 |
Roof mounted |
Sky Solar Ltd. |
Construction |
9307 Union Dr., R.R.#2, Mount Brydges, N0L 1W0 |
2013.06-2014.02 |
100,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Construction |
8318 Scotchmere Dr., Strathroy-Caradoc, N7G 3H3 |
2013.06-2014.02 |
100,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Construction |
Scotchmere Dr., Strathroy-Caradoc, N0L 2L0 |
2013.06-2014.02 |
100,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Construction |
9274 Union Dr., R.R.#2, Mount Brydges, N0L 1W0 |
2013.08-2014.05 |
100,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Construction |
419 Penetanguishene Rd., Barrie, L4M 4Y8 |
2013-08-2014.05 |
100,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Construction |
1572 Story Rd., R.R.#1, Midhurst, L0L 1X0 |
2013.11-2014.04 |
75,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Construction |
1572 Story Rd., R.R.#1, Midhurst, L0L 1X0 |
2013.11-2014.04 |
100,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Construction |
1216 Penetanguishene Rd., R.R.#1, Barrie, L4M 4Y8 |
2013.12.2014.05 |
100,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Construction |
1216 Penetanguishene Rd., R.R.#1, Barrie, L4M 4Y8 |
2013.12-2014.05 |
250,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Construction |
1927 Russel Road, Midhurst, L0L 1X0 |
2013.12-2014.05 |
250,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Construction |
1572 Story Road, R.R.#1, Midhurst L0L 1X0 |
2013.12-2014.05 |
250,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Construction |
1927 Russel Road, Midhurst, L0L 1X0 |
2013.12-2014.05 |
250,000 |
FIT 1.0 |
Ground mounted |
Mann Solar Ltd. |
Full EPC Service |
405 Gordon Baker dr. |
2012.05-2013.01 |
200,000 |
FIT 1.0 |
Roof mounted |
Powerstream |
Full EPC Service |
1229 Lorimar Dr. |
2012.05-2013.01 |
250,000 |
FIT 1.0 |
Roof mounted |
Powerstream |