Toronto Hydro awarded EG Energy for its FIT 4.0 Group 1 EPC services with capacity of 1.3 MW
EG Solar Power was awarded by Toronto Hydro with its 16 FIT 4.0 Group 2 EPC services with capacity of 1.35 MW.
EG Solar Power was awarded by Toronto Hydro with its 16 FIT 4.0 Group 2 EPC services with capacity of 1.35 MW.